Malmö University Publications
Change search
Refine search result
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Persson, Mats
    et al.
    Malmö högskola, Faculty of Technology and Society (TS).
    Sigfrid, Lotta
    www.ByggAi.se för renoveringsarbeten i miljonprogrammet: förstudie2013Report (Other academic)
    Abstract [en]

    In the preliminary study, we can conclude that there is a great need for reconstruction measures throughout the Swedish building stock. This is particularly important from a sustainability perspective if we consider the demands of the construction sector. The requirement of work instructions for rebuilding and refurbishment measures are not expected to be affected by different management strategies for different housing or of the type of contract form that is current. Whether the measure is part of a larger remodeling project or performed on framework agreement as to the place in the same instruction. There are currently about 20 finished work instructions on the website www.ByggAi.se that are directly applicable to renovation work. A systematic development should begin to create additional approximately 100-150 working instructions. At the same time the design and availability of work instructions should be developed.

    Download full text (pdf)
    FULLTEXT01
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf